A rainbow over Nueva Córdoba, Córdoba, Argentina

Utilities in Córdoba

Utilities in Córdoba

For ordinary unsubsidized residential service, a 200 kWh example totals US$37 (ARS 57,064.76) in fixed and energy charges.

Moving to Córdoba? Get a written Relocation Plan, $199 USDRequest a free fit check call

EPEC tariff date
October 1
Published October 2
200 kWh component
US$37ARS 57,064.76
Before additional taxes and levies
July combined benchmark
US$75ARS 115,239.29
Older estimate, not the home's current bill
Current full bill
Quote required
Depends on the meter and household
On this page

The short answer

EPEC's tariff published October 2 applies from October 1, 2026. For ordinary unsubsidized residential service, a 200 kWh example totals US$37 (ARS 57,064.76) in fixed and energy charges. Taxes and levies are additional. This guide has no confirmed current combined electricity, gas and water estimate. The calculator uses a July utility benchmark, so request recent bills for the apartment before using that allowance in your own budget.

Check the home's electricity, gas and water bills before renting. Heating fuel, meter type and taxes can change what you pay beyond the published tariff.

  • The current EPEC schedule applies from October 1, 2026.
  • The 200 kWh tariff-component example is US$37 (ARS 57,064.76).
  • The combined allowance starts from a July 2026 benchmark.
  • Request current gas and water bills for the property you are considering.

Last checked by Settle in Latin America. How we check every figure

Check the electricity tariff band and additional charges

For ordinary unsubsidized residential use above 120 kWh and up to 500 kWh, EPEC lists a monthly fixed charge of US$1.91 (ARS 2,948.6141). The first 120 kWh cost US$0.16 (ARS 250.30482) each. Further units cost US$0.19 (ARS 300.99460) per kWh. Additional charges must be included to calculate a final bill.2

200 kWh component calculation
ComponentCalculation or chargeWhat it covers
Fixed chargeUS$1.91ARS 2,948.6141Ordinary unsubsidized band
First 120 kWh120 times 250.30482 pesosUS$19ARS 30,036.5784
Next 80 kWh80 times 300.99460 pesosUS$16ARS 24,079.5680
Total componentUS$37ARS 57,064.76Additional household charges excluded
The calculated charges total US$38 (ARS 57,064.7605 before peso rounding). Subsidy eligibility, taxes and other household charges are excluded.

Source 2

The calculator's utility allowance uses a July benchmark

Defensoría July service benchmark
ServiceMonthly referencePeriod
ElectricityUS$32ARS 49,978.11July 2026
GasUS$32ARS 49,980.71July 2026
WaterUS$9.90ARS 15,280.47July 2026
CombinedUS$75ARS 115,239.29July estimate for the lowest service categories
The table does not give enough consumption detail to calculate the bill for a particular home.

Source 3

The calculator rounds the July combined allowance to the nearest ARS 1,000 and applies the stated multipliers for higher estimates. This is an older planning estimate. The guide has no confirmed current gas and water estimates to combine with electricity. Get recent bills for your home.3

Confirm fiber availability at the address

Personal Córdoba home internet, checked October 9
Advertised planFirst six monthsRegular monthly list price
300 Mbps symmetricUS$15ARS 23,000US$59ARS 91,860
600 Mbps symmetricUS$20ARS 31,000US$70ARS 107,700
Address and customer conditions apply. Test the installed connection. Advertised speeds do not establish typical city performance.

Source 4

Personal includes Córdoba Capital in its fiber service cities, but requires an address check. Confirm installation with the operator, then test calls and uploads from the room you will use.5

Personal's advertised symmetric plans Mbps advertised
  • 300 plan300 Mbps symmetric
  • 600 plan600 Mbps symmetric

Advertised plan speeds. Test performance at the home.

Source 4

Ask for the apartment's recent bills before signing

  1. Get recent bills

    Inspect the electricity, gas, water and building statements for the actual unit.

  2. Identify heating and meters

    Ask which fuel heats the water and rooms and whether meters are individual.

  3. Confirm the tariff profile

    Check the customer class and subsidy status on the meter's bill. Another home's bill may use different terms.

  4. Check liability

    Confirm connection, arrears, standing charges and repair responsibilities in writing.

  5. Test connectivity

    Use the operator's address check and obtain the regular monthly internet price.

Compare utilities with rent, climate and work needs

Questions people ask

When does the Córdoba EPEC tariff in this guide apply?

From October 1, 2026. EPEC published the schedule on October 2.

What does the Córdoba 200 kWh electricity example measure?

Fixed and energy components for the ordinary unsubsidized band. It excludes additional taxes, levies and household-specific charges.

Is the 200 kWh example a complete Córdoba electricity bill?

No. US$38 (ARS 57,064.7605 before peso rounding) covers fixed and energy charges. The final bill depends on the meter's tariff class and additional charges.

Can a foreign newcomer assume an EPEC subsidy?

This guide cannot confirm your eligibility. Check the current subsidy procedure and the meter's category.

Why does the Córdoba budget use July utilities?

The guide has no confirmed current combined gas, water and electricity estimate. The calculator uses the dated July allowance with its stated multipliers.

Does the July Córdoba utility benchmark specify the apartment's consumption?

No. The table does not give that consumption detail. Request bills for the home and check its heating system.

Which bills should I request before renting in Córdoba?

Recent electricity, gas, water and expensas statements for the actual unit. Confirm meters, heating fuel, arrears and liability.

Does Personal's Córdoba city listing establish installation at every address?

No. The operator requires an address check. Confirm installation timing and the regular price before depending on the connection.

Plan your move

Get a free move checklist for Córdoba.

Answer three questions and see what to do first. Print it or save it.

  1. Answer three questions
  2. Get your tasks in order
  3. Print it or save it
Book a Relocation Plan

The checklist, guides, and My Area are free for any city. A Relocation Plan is available for 19 cities, listed on our fees page. For a listed city you can pay by card at once, with a full refund if your move turns out not to fit. For any other place, ask us first.

Sources and how we check them

Sources and how we check them5 sources

Every figure on this page comes from the official or primary source listed here. We checked them in . Rules and prices change, so confirm anything important with the source before you act on it.

  1. Banco Central de la República Argentina, US dollar quotation, November 11, 2026 (ARS 1,544.00 per US dollar), the latest the BCRA API published when read November 12, 2026 (opens in a new tab)
  2. EPEC residential tariff effective October 1, published October 2, 2026 (opens in a new tab)
  3. Defensoría Córdoba food, utility and retiree benchmarks, July 2026 (opens in a new tab)
  4. Personal Córdoba home internet plans (opens in a new tab)
  5. Personal fiber availability by city (opens in a new tab)

A rainbow over Nueva Córdoba. Photograph dated 2011. Hero photo by https://www.flickr.com/people/sebadella/, CC BY 2.0 (opens in a new tab), from Wikimedia Commons (opens in a new tab).