The water-treatment plant in Colón

Colón, Entre Ríos

Utilities in Colón

An illustrative 200 kWh month totals US$35 (ARS 54,782.23) for selected October electricity components.

Moving to Colón? Ask us anything

On this page

The short answer

ENERSA lists its Colón office at San Martín 664, open weekdays from 7 a.m. to 2 p.m. An illustrative 200 kWh month totals US$35 (ARS 54,782.23) for selected October electricity components. Taxes and other bill items are excluded. Water, gas and home internet still need property-specific prices, so this figure is not a complete household utility budget.

Request recent bills and activation dates for the actual home before collecting the keys.

  • San Martín 664. ENERSA's Colón commercial office.
  • 200 kWh assumed. The tariff example excludes taxes and other bill items.
  • Check the address. Internet coverage and installation price need a fresh quote.

Last checked by Settle in Latin America. How we check every figure

What to consider

Understand the electricity example

October 2026 unsubsidized T1-R electricity illustration
ComponentQuantityPublished priceComponent total
Monthly fixed chargeOneUS$2.01ARS 3,106.23US$2.01ARS 3,106.23
First consumption band100 kWhUS$0.16 per kWhARS 242.85US$15.73ARS 24,285
Second consumption band100 kWhUS$0.18 per kWhARS 273.91US$17.74ARS 27,391
Selected components200 kWh assumedFixed charge plus both bandsUS$35ARS 54,782.23
This assumes 200 kWh in an unsubsidized T1-R account. Taxes, other bill components, water and gas are excluded. Convert the peso subtotal before rounding. It is not a complete household bill.

Sources 1,2

Arrange the account and connection

ENERSA asks for ownership or tenancy documents, DNI documents, a licensed electrician's installation certificate and the connection fee. Nonowners need an acceptable guarantor or a guarantee deposit. Ask which documents a newcomer can use and obtain the current charges before applying.3

The Colón commercial office is at San Martín 664, weekdays from 7 a.m. to 2 p.m. Confirm holiday opening and the procedure for the existing meter before visiting.3

Check current water information for the home

The municipal monitoring folder contains reports dated August 25, 2026 for the treatment-plant outlet and Bolívar 30. Both list zero total and fecal coliforms in the tested water. Mesophilic bacteria were not investigated. These dated, named-point results do not confirm current water quality at your rental.4,5

For water and sewer problems, the municipal page lists Obras Sanitarias at 03447 421627 as a 24-hour on-call service. Ask about the property's connection, recent problems and current information.6

Get a home internet quote

IS includes Colón in its inquiry form and describes fiber and wireless service. Its listed regional agency is at San Martín 1278 in San José, outside Colón, telephone +54 3447 524550. Ask about feasibility at the rental, activation, final monthly price, upload speed and equipment.7

Los Bretes lists bottled gas. Artalaz describes electric apartments and includes Wi-Fi in its approximate common charges. Neither description replaces recent bills or an in-home connection test.8,9

Review the rental charges before deciding what is included. Put payment responsibilities in the lease and identify the account holder. Add setup costs separately from recurring bills. Test the working connection before moving. Build the household budget with the missing prices included. Schedule activation before arrival.

For a long stay, inspect heating, cooling and drainage and request seasonal bills. If you need a workspace outside the home, ask about current municipal access before depending on a desk.

Questions people ask

How much is electricity in Colón?

It depends on the account category, usage and other bill items. The displayed unsubsidized 200 kWh example is US$35 (ARS 54,782.23) for selected October 2026 tariff components, not a complete bill.

Where is the ENERSA office?

San Martín 664 in Colón. Published commercial-office hours are weekdays from 7 a.m. to 2 p.m. Confirm holiday opening before visiting.

What documents does ENERSA request?

Its household new-connection guidance lists ownership or tenancy documents, DNI documents, an electrician's certificate and the fee. Nonowners need an acceptable guarantor or guarantee deposit. Ask about foreign documents and the existing meter.

How do I report a water problem?

The municipal CAV page lists the Obras Sanitarias 24-hour on-call service at 03447 421627. Give the exact property address and describe the problem.

Do the August water reports cover my rental?

No. They describe named points and specified tests in reports dated August 25, 2026. Ask for current information relevant to the home.

Can I order fiber internet?

Ask IS to check the exact address. Colón appears in its inquiry form, but installation, price and achieved speeds are not confirmed for a rental.

Is gas included in the rent?

That is unknown for the displayed offers. Los Bretes lists bottled gas, while Artalaz describes electric apartments. Ask about equipment, supplier, refills and charges.

What should I ask the landlord for?

Recent electricity, water, gas and internet bills, account details and any unpaid balance. Confirm which charges you pay and when each service will work.

Plan your move

Get a free move checklist for Colón.

Answer three questions and see what to do first. Print it or save it.

  1. Answer three questions
  2. Get your tasks in order
  3. Print it or save it
See where a Relocation Plan is available

The checklist, guides, and My Area are free for any city. A Relocation Plan is available for 19 cities, listed on our fees page. For a listed city you can pay by card at once, with a full refund if your move turns out not to fit. For any other place, ask us first.

Sources and how we check them

Sources and how we check them9 sources

Every figure on this page comes from the official or primary source listed here. We checked them in . Rules and prices change, so confirm anything important with the source before you act on it.

  1. EPRE Resolution 163/26, October 2026 electricity tariff (opens in a new tab)
  2. EPRE Resolution 163/26, October 2026 electricity tariff (opens in a new tab)
  3. ENERSA commercial information and electricity tariffs (opens in a new tab)
  4. CDB Colón treatment-plant water report, August 25, 2026 (opens in a new tab)
  5. CDB Colón Bolívar 30 water report, August 25, 2026 (opens in a new tab)
  6. Colón resident service center, CAV (opens in a new tab)
  7. IS home internet inquiry and regional offices (opens in a new tab)
  8. Brenda García Los Bretes rental, BGP1331 (opens in a new tab)
  9. Brenda García Artalaz apartments, BAP9828922 (opens in a new tab)

Colón water-treatment plant, July 19, 2014. Historical exterior, not a test of current water quality. Resized and converted to WebP. Hero photo by Dario Alpern, CC BY-SA 4.0 (opens in a new tab), from Wikimedia Commons (opens in a new tab).